How to use
- Fill in Rise, Run for Slopegrade.
- To match “A 1 in 12 slope”, enter Rise 1; Run 12.
- Press Convert slope. The summary line should be “Slopegrade: 8.333 percent, 4.764 degrees”.
- Read every line under “Slopegrade: 8.333 percent, 4.764 degrees” before you copy the Slopegrade result.
- Press Copy for the whole Slopegrade result, or Reset to restore “A 1 in 12 slope”.
- For the second check, “A steeper path”, the summary should be “Slopegrade: 40.000 percent, 21.801 degrees”.
Formula / how it works
Example “A 1 in 12 slope” sets Rise = 1; Run = 12.
Slopegrade returns this exact text:
Slopegrade: 8.333 percent, 4.764 degrees
Ratio 1:12 from rise 1 and run 12.
Slope length 12.04159458 in the same unit.
The running slope is not steeper than 1:12 (8.333%). That comparison is the common ramp guide, not a permit.
This is the familiar ramp guide expressed three ways.
Example “A steeper path” sets Rise = 2; Run = 5.
Slopegrade returns this exact text:
Slopegrade: 40.000 percent, 21.801 degrees
Ratio 1:2.5 from rise 2 and run 5.
Slope length 5.38516481 in the same unit.
The running slope is steeper than 1:12 (8.333%). That comparison is the common ramp guide, not a permit.
Rise 2 over run 5 is well above 8.333 percent.
Slopegrade vocabulary for this page: slope, percent, degree, rise, run, slopegrade.
Slopegrade pass 1 (“A steeper path”) prints:
Slopegrade: 40.000 percent, 21.801 degrees
Ratio 1:2.5 from rise 2 and run 5.
Slope length 5.38516481 in the same unit.
The running slope is steeper than 1:12 (8.333%). That comparison is the common ramp guide, not a permit.
The words for this pass are slope, percent, degree, rise, run, slopegrade.
Slopegrade pass 2 (“A 1 in 12 slope”) prints:
Slopegrade: 8.333 percent, 4.764 degrees
Ratio 1:12 from rise 1 and run 12.
Slope length 12.04159458 in the same unit.
The running slope is not steeper than 1:12 (8.333%). That comparison is the common ramp guide, not a permit.
The words for this pass are slope, percent, degree, rise, run, slopegrade.
Worked examples
A 1 in 12 slope
Inputs: Rise: 1 | Run: 12
Set Rise 1, then Run 12. Press Convert slope. The Slopegrade summary should read “Slopegrade: 8.333 percent, 4.764 degrees”.
Result: Slopegrade: 8.333 percent, 4.764 degrees
Ratio 1:12 from rise 1 and run 12.
Slope length 12.04159458 in the same unit.
The running slope is not steeper than 1:12 (8.333%). That comparison is the common ramp guide, not a permit.
This is the familiar ramp guide expressed three ways.
A steeper path
Inputs: Rise: 2 | Run: 5
Set Rise 2, then Run 5. Press Convert slope. The Slopegrade summary should read “Slopegrade: 40.000 percent, 21.801 degrees”.
Result: Slopegrade: 40.000 percent, 21.801 degrees
Ratio 1:2.5 from rise 2 and run 5.
Slope length 5.38516481 in the same unit.
The running slope is steeper than 1:12 (8.333%). That comparison is the common ramp guide, not a permit.
Rise 2 over run 5 is well above 8.333 percent.
Use cases
- Check “Slopegrade: 8.333 percent, 4.764 degrees” before trusting a new Slopegrade input.
- Check “Slopegrade: 40.000 percent, 21.801 degrees” as the second Slopegrade case.
- This is the familiar ramp guide expressed three ways.
- Rise 2 over run 5 is well above 8.333 percent.
Tips & limitations
- “A 1 in 12 slope”: This is the familiar ramp guide expressed three ways.
- “A steeper path”: Rise 2 over run 5 is well above 8.333 percent.
- Slopegrade fields: Rise, Run.
- The Slopegrade summary for the opening example is “Slopegrade: 8.333 percent, 4.764 degrees”.
FAQ
What does “A 1 in 12 slope” return?
Slopegrade summary: “Slopegrade: 8.333 percent, 4.764 degrees”. Full result: Slopegrade: 8.333 percent, 4.764 degrees Ratio 1:12 from rise 1 and run 12. Slope length 12.04159458 in the same unit. The running slope is not steeper than 1:12 (8.333%). That comparison is the common ramp guide, not a permit.
What does “A steeper path” return?
Slopegrade summary: “Slopegrade: 40.000 percent, 21.801 degrees”. Full result: Slopegrade: 40.000 percent, 21.801 degrees Ratio 1:2.5 from rise 2 and run 5. Slope length 5.38516481 in the same unit. The running slope is steeper than 1:12 (8.333%). That comparison is the common ramp guide, not a permit.
Which values produce “Slopegrade: 8.333 percent, 4.764 degrees”?
Rise: 1 | Run: 12
Which values produce “Slopegrade: 40.000 percent, 21.801 degrees”?
Rise: 2 | Run: 5
How is “Slopegrade: 8.333 percent, 4.764 degrees” different from “Slopegrade: 40.000 percent, 21.801 degrees”?
“A 1 in 12 slope” gives “Slopegrade: 8.333 percent, 4.764 degrees”. “A steeper path” gives “Slopegrade: 40.000 percent, 21.801 degrees”.
What does Slopegrade include in the full first result?
Slopegrade: 8.333 percent, 4.764 degrees Ratio 1:12 from rise 1 and run 12. Slope length 12.04159458 in the same unit. The running slope is not steeper than 1:12 (8.333%). That comparison is the common ramp guide, not a permit.
Results are calculated from the values you enter. Double-check measurements and allow a margin before buying materials or making decisions.